Bathroom Upgrade - Progress Report
Wednesday, February 8, 2006
I have been told by my son that my posts are too long, so I will make this brief.
I put the second coat of paint on the "powder room" last night. While it was drying we found a few blemishes in the paint, specifically in the wall underneath the paint... So I am going to attempt to spackle those spots again, and repaint them. I hope I can smooth the blemishes out.
The next step is to install the new flooring. We got those 1' x 1' vinyl floor tiles. The existing flooring is just one large piece of vinyl. I have to figure out how to cut the tiles around the toilet without it looking like a "hack job". Any advice?
Labels: Sweetie





There are 0 additional Ramblings:
Add your rambling comment...